Faced with increasing costs to maintain their aging roof, Forsan Independent School District contracted with DK Haney Roofing to install a Duro-last roof. The existing roof was reaching the end of it's useful life and the continual maintenance costs were skyrocketing. DK Haney faced several unique challenges with this job because of an extensive system of conduits and equipment mounted on the roof.
|
The links in this column
will lead to interactive
full immersion interactive
panoramic images.
|